Skip to main content

Table 9 Pre-optimized system vs post-optimized system (Pekan)

From: Large-scale solar system design, optimal sizing and techno-economic-environmental assessment

 

Pre-optimization

Post-optimization

PV model

Q-Peak-Duo-G8-345

Q.PEAK L-G4.1 345 Maxim

Inverter model

Growatt CP1260 Station

Growatt CP1000 Station

Optimizer

None

MAX 20800A (384 W)

System production

40,785 MWh/year

41,262 MWh/year

Performance ratio

0.791

0.801

System losses

0.06%

0.06%