Skip to main content

Table 3 Evaluation of power losses on IEEE 33 bus

From: Optimal energy scheduling method for the North Cameroonian interconnected grid in response to load shedding

Bus numbers

Distributed generations sizes (MW)

Plosses kW

Qlosses kVar

2

8.068

10.580

23.760

3

8.344

7.198

16.569

4

4.531

9.117

18.691

5

7.300

5.661

11.894

6

7.522

5.662

12.020

7

7.500

4.659

10.897

8

6.7758

5.157

11.930

9

6.996

5.243

12.208

10

5.028

6.993

13.124

11

5.693

6.192

13.618

12

5.600

6.339

13.948

13

5.773

6.771

14.206

14

6.486

4.639

10.018

15

6.565

4.432

10.937

16

6.195

4.710

10.880

17

6.535

4.367

10.430

18

5.930

4.258

10.728

19

5.276

4.788

10.882

20

4.188

5.701

13.300

21

4.434

6.939

14.584

22

3.214

7.594

16.576

23

3.127

7.705

16.838

24

5.783

5.687

11.739

25

4.968

6.990

14.698

26

3.110

7.178

17.749

27

5.773

6.993

13.124

28

6.486

6.192

13.618

29

6.565

6.339

13.948

30

6.195

6.771

14.206

31

6.535

4.639

10.018

32

5.930

4.432

10.937

33

5.276

4.710

10.880