Skip to main content

Table 5 Criteria for the optimal choice of delay

From: Balancing short-term costs and long-term benefits: an analysis of the impact of hydroelectric power generation on electricity prices volatility in Cameroon

Lag

LL

LR

FPE

AIC

HQIC

SBIC

0

33.5682

 

1.9e-08

−3.57102

−3.55866

−3.32959

1

81.4752

95.814

1.3e-09

−6.4344

−6.36022

−4.98579

2

149.274

135.6

2.5e-11*

−11.7843

−11.6483

−9.12851

3

2497.31

4696.1

 

−302.163

−301.965

−298.3

4

2547.46

100.3*

 

−308.432*

−308.234*

−304.569*

  1. Source: Authors
  2. LR sequential LR test statistic (each test at 5% level), FPE final prediction error, AIC Akaike Information Criterion, SC Schwarz Information Criterion, HQ Hannan–Quinn Information Criterion
  3. * indicates optimal lag