| Reactor 1 | Reactor 2 | Reactor 3 |
---|---|---|---|
Volume reactor (m3) | 3.28 | 7.05 | 15.09 |
Digging the pit | $49.85 | $102.84 | $215.97 |
Construction | $14.38 | $56.78 | $147.27 |
Masonry | $33.23 | $68.56 | $143.98 |
Total labour | $97.46 | $228.18 | $507.22 |
Total construction + labour | $685.78 | $909.04 | $1539.53 |
Cost CHP/scrubber unit | $150 | $150 | $150 |
Pump | $50 | $50 | $50 |
Other costs miscellaneous | $34.29 | $45.45 | $76.98 |
Total | $899.36 | $1139.92 | $1837.44 |