From: Modeling, design and optimization of integrated renewable energy systems for electrification in remote communities
Parameter
Value
Annual capacity shortage (%)
0
Hourly load operating reserve (%)
10
Penalties over CO2 emissions ($/ton)
Project lifetime (years)
20
Minimum renewable fraction (%)
100
Discount rate (%)
6.5%
Inflation rate (%)
5%