Table 5 Sensitivity analysis of key variables

From: Modeling, design and optimization of integrated renewable energy systems for electrification in remote communities

Variable

Scenario 1

Scenario 2

Variation (%)

Change in NPC (%)

Variation (%)

Change in NPC (%)

Solar PV capital cost

20

0.31

20

0.4

Biomass-based generator capital cost

20

4.98

20

6.75

Wind turbine capital cost

20

1.35

20

1.03

Discount rate

20

− 7.32

20

-6.14

Inflation rate

20

6.13

20

4.97

Biomass price

20

1

20

1.25

Battery capital cost

20

2.49

20

2.32

Biomass-based generator efficiency

10

− 1.51

10

− 1.62

Wind turbine efficiency

10

− 1.38

10

− 1.25

Solar PV panel efficiency

10

− 1.23

10

− 1.02