Skip to main content

Table 4 Results for 15 bus system

From: Optimal DG placement for benefit maximization in distribution networks by using Dragonfly algorithm

 

With out DG

With DG at 0.9pf

With DG at UPF

DG location

–

6

6

DG size (kVA)

–

907.785

675.248

TLP (kW)

61.7933

33.385

45.8035

TLR (kVAR)

57.2969

29.89

41.88

Vmin (p.u.)

0.9445

0.959

0.9527

Cost of Energy losses ($)

4970.3

2685.31

3684.18

Cost of PDG ($/MW h)

–

16.5404

13.754

Cost of QDG ($/MVAR h)

–

1.8656

–