Skip to main content

Table 5 Results for 33-bus system with DG at upf

From: Cost–benefit analysis for optimal DG placement in distribution systems by using elephant herding optimization algorithm

 

Without DG

Method (Murthy and Kumar 2013)

Method in Dinakara Prasad Reddy et al. (2017)

Proposed method

DG location

16

6

30

DG size (kW)

1000

2590.2

1544.5

Total real power loss (TLP) (kW)

211

136.7533

111.0338

125.2

Total reactive power (TLR) loss (kVAR)

143

92.6599

81.6859

89.3

Vmin (p.u.)

0.904

0.9318

0.9424

0.9272

Cost of energy losses ($)

16982.6

11,007.9

8930.65

10,067.3

Cost of PDG ($/MW h)

20.25

52.05

31.15