Method (Murthy and Kumar 2013) | Method in Dinakara Prasad Reddy et al. (2017) | Proposed method | |
---|---|---|---|
DG location | 16 | 6 | 30 |
DG size (kVA) | 1200 | 3073.5 | 1939.3 |
TLP (kW) | 112.7864 | 70.8652 | 78.4 |
TLR (kVAR) | 77.449 | 56.7703 | 58.97 |
Vmin (p.u.) | 0.9378 | 0.9566 | 0.9386 |
Cost of energy losses ($) | 9078.7686 | 5700.01 | 6308.8 |
Cost of PDG ($/MW h) | 21.85 | 55.5 | 35.102 |
Cost of QDG ($/MVAR h) | 2.1207 | 6.2 | 3.928 |