Method (Murthy and Kumar 2013) | Method in Dinakara Prasad Reddy et al. (2017) | Proposed method | |
---|---|---|---|
DG location | 65 | 61 | 61 |
DG size (kVA) | 1750 | 2217.3 | 2216.3 |
TLP (kW) | 65.4502 | 27.9636 | 27.95 |
TLR (kVAR) | 35.625 | 16.4979 | 16.46 |
Vmin (p.u.) | 0.969302 | 0.9728 | 0.9724 |
Cost of energy losses ($) | 5268.4297 | 2249.2 | 2249.4 |
Cost of PDG ($/MW h) | 31.75 | 40.1 | 40.0916 |
Cost of QDG ($/MVAR h) | 3.083 | 4.48 | 4.4824 |