Table 3 LCOE of SCGT at different discount rates and in the two fuel scenarios

From: Conditions for economic competitiveness of pumped storage hydroelectric power plants in Egypt

Fuel cost scenario LCOE of SCGT at different r (¢/kWh)
r: 8% r: 10% r: 12% r: 14%
Fixed international fuel costs 13.45 13.47 13.5 13.52
Escalated international fuel costs 18.3 17.98 17.69 17.45