Skip to main content

Table 7 Balances and performances of the proposed stand-alone (off-grid) PV system in Kathmandu

From: Techno-economic feasibility analysis of a 3-kW PV system installation in Nepal

  Glob Hor Glob Eff E_Avail E unused E_miss E_User E_load SolFrac
kWh/m2 kWh/m2 kWh kWh kWh kWh kWh kWh
January 138.2 204.9 534.4 186.5 0.00 309.7 309.7 1.000
February 140.7 184.0 469.5 156.1 0.00 279.8 279.8 1.000
March 169.2 189.5 479.0 239.6 0.00 207.4 207.4 1.000
April 183.7 180.7 447.2 223.1 0.00 200.7 200.7 1.000
May 191.3 170.5 425.3 189.1 0.00 207.4 207.4 1.000
June 175.2 151.1 378.4 61.0 0.99 298.7 299.7 0.997
July 156.4 135.9 342.8 25.4 21.90 287.8 309.7 0.929
August 157.5 146.8 368.4 56.5 20.21 289.5 309.7 0.935
September 138.3 141.9 358.9 127.3 0.57 200.2 200.7 0.997
October 148.9 178.5 450.9 214.9 0.00 207.4 2007.4 1.000
November 131.0 184.8 472.0 241.8 0.00 200.7 200.7 1.000
December 139.0 218.3 561.3 222.4 0.00 309.7 309.7 1.000
Total 1869.2 2086.9 5288.2 1943.7 43.66 2999.2 3042.9 0.986